毛片午夜-毛片线看免费观看-毛片新网址-毛片亚洲av无码精品国产午夜-毛片亚洲毛片亚洲毛片-毛片一

Welcome to the official website of SHEN ZHEN SHI FUYUAN TECHNOLOGY CO,LTD!
SHEN ZHEN SHI FUYUAN TECHNOLOGY CO,LTD
A production-oriented company specializing in the development, production, and sales of
various precision connectors
  • First hand source of goodsFirst hand source of goods
  • Complete modelsComplete models
  • Processing customizationProcessing customization
  • Quality assuranceQuality assurance

0755-29163078

News

Contact information

Mr. Zheng: 151-1806-0060
Phone: 0755-29163078
Fax: 0755-29163178
Address: 720, Building A, Huachuangda Qianhai Maker Innovation Alliance, Xinghua 1st Road, Xin'an Street, Bao'an District, Shenzhen
What are the factors that affect the mirror angle of headphone sockets?
Number of views:2369 Time: 2023-12-29

The new photoelectric switches in the Shenzhen headphone socket series usually have the function of automatically preventing mutual interference, so there is no need to worry about mutual interference. However, the series of opposed infrared photoelectric switches are located in several groups parallel to each other


When installing nearby, neighboring groups and mutual interference should be prevented. The most effective way to prevent such interference is to cross set the projector and receiver, and also widen the group distance when exceeding the group. Of course, using different frequencies


The model is also a good way. The effective method to prevent mutual interference in series reflective photoelectric switches is to widen the spacing. Dongguan headphone sockets, and the farther the detection distance, the larger the interval should be. The specific interval


It should be determined based on the debugging situation. Of course, models with different operating frequencies can also be used.


Mirror angle influence: When the tested object has luster or encounters a smooth metal surface, the reflectivity is generally high, which has a similar mirror effect. In this case, the angle between the projector and the tested object should be installed,


To prevent misoperation, the optical axis should not be perpendicular to the detected object. Excluding the influence of background objects: When using reflective diffusion projectors and receivers, sometimes the detected object is closer to the background object,


Photoelectric switches or objects with high reflectivity, such as smooth backgrounds, may cause unstable detection of the photoelectric switch. Due to the high demand for electricity in winter, some users prefer to use DC power sockets on their computers


Although it is very convenient to use electric heaters and other appliances plugged into the same multi-purpose socket, there are significant safety hazards. In terms of electric heating, its starting current is very high. If compared to other high-power systems


When the electrical appliances are started at the same time, the contacts and leads of the socket will be unable to withstand the sudden and excessive electrical load, affecting each other and even damaging the electrical appliances themselves, and even causing accidents.


When installing headphone sockets in Shenzhen, the distance between the exposed sockets and the ground should not be less than 1.8 meters; The concealed socket should be no less than 0.3 meters above the ground. To prevent children from getting electric shock, touching with fingers, or inserting metal objects into the hole of the power supply,


Be sure to choose a safety socket with a safety shield; The construction wiring requirements for single-phase two eye sockets are: when the holes are arranged horizontally, they are "left zero and right fire", and when arranged vertically, they are "above fire and below zero"; single-phase


The wiring requirements for a three eye socket are: the grounding hole at the top must be firmly, solidly, and correctly connected to the grounding wire, and must not be disconnected. The remaining two holes of the DC power socket are marked as "left zero and right fire"


When wiring, it is worth noting that the neutral wire and the protective grounding wire should not be wrongly connected or integrated.



QR code
Contact information
Mr. Zheng:151-1806-0060

Phone: 0755-29163078

Fax: 0755-29163178

Address: 720, Building A, Huachuangda Qianhai Maker Innovation Alliance, Xinghua 1st Road, Xin'an Street, Bao'an District, Shenzhen


Copyright ? SHEN ZHEN SHI FUYUAN TECHNOLOGY CO,LTD Copyright 粵ICP備10011451號

主站蜘蛛池模板: 91精品全国免费观看老司机 | 国产精品99久久久久久夜夜嗨 | 中文字幕在线免费播放 | 五月婷婷亚洲 | 欧美日产| 114一级毛片免费观看 | 午夜小视频网站 | 香蕉视频毛片 | 成人免费毛片网站 | 男女啪啪猛烈免费网站 | 国产精品真实对白精彩久久 | 天天摸日日 | 亚洲国产精品悠悠久久琪琪 | 激情网站视频 | 在线看日本吃奶孕交 | 一级成人黄色片 | 亚洲一区欧美日韩 | 欧美亚洲国产另类在线观看 | 中文字幕视频不卡 | 97在线看片免费福利视频 | 97成人精品视频在线播放 | 尤物国产在线精品福利一区 | 久久久久久久久免费影院 | 欧美日韩高清一区二区三区 | 日本中文字幕在线观看视频 | 国产免费一区二区三区在线观看 | 黄色网欧美 | 高清在线一区二区三区亚洲综合 | 久草在线视频资源站 | 天天爽夜夜爽夜夜爽精品视频 | 久久久国产成人精品 | 国产欧美久久一区二区 | 日本精品视频在线观看 | 天天操天天操天天操香蕉 | 久久影院朴妮唛 | 老师粗又长好猛好爽视频 | 人人干在线观看 | 亚洲综合一区二区 | 国产一级淫片a视频免费观看 | 亚洲精品毛片久久久久久久 | 国内精品久久久久鸭 |